# Small Hydropower in Japan by Prefecture 2026: 250 MW Under 1,000 kW Nationwide, Toyama Ranks First (June 2026) By Karatsu Farm & Food (Karatsu Data Bank) / HTML: https://karatsu-f-f.com/en/small-hydro-data.html / Published: 2026-11-20 - Small hydropower under 1,000 kW selling under FIT/FIP in Japan (our tally of Agency for Natural Resources and Energy data, June 2026): 250,440.7 kW from 1,023 plants (179,031.1 kW new certifications, 71,409.6 kW transferred) - By prefecture (same): 1 Toyama 17,090 kW, 2 Gifu 15,680.5 kW, 3 Nagano 15,494.2 kW, 4 Hokkaido, 5 Kagoshima; Saga 30th with 1,873.6 kW from 12 plants - Saga by municipality (same): Karatsu City 999 kW (largest, about 53.3% of the prefectural total), Tara 248 kW, Kanzaki 199 kW, Kashima 196 kW, Saga City 132.7 kW - Trend (Japan, under 1,000 kW): 101,280.3 kW in March 2018 to 250,440.7 kW in June 2026 (about 2.47 times, our calculation) - World small hydropower up to 10 MW (UNIDO and ICSHP, WSHPDR 2022): about 79.0 GW, 64% of the 221.7 GW potential untapped; 1 China 41,985 MW, 2 USA, 3 Italy, 4 Japan 3,577 MW, 5 Norway - National target (ANRE, June 2025): small and medium hydropower, 10.4 GW in FY2030; 10.0 GW installed in December 2024 - Karatsu (Karatsu Farm & Food): one small hydro generator in the Yokomakura irrigation channel (installed 7 October 2026, powering electric fences); output and operation being recorded ## How much small hydropower does Japan have? (2026) **At the end of June 2026, hydropower plants under 1,000 kW whose electricity is bought under Japan's feed-in tariff (FIT/FIP) numbered 1,023 with 250,440.7 kW, or about 250 MW (our tally of [Agency for Natural Resources and Energy, installed capacity by prefecture, June 2026](https://www.fit-portal.go.jp/servlet/servlet.FileDownload?file=015hA000001K8FN)). Toyama Prefecture has the most with 17,090 kW, followed by Gifu and Nagano. Saga Prefecture ranks 30th with 1,873.6 kW from 12 plants.** This page is part of the Karatsu Data Bank by Karatsu Farm & Food, a nonprofit in Karatsu, Saga Prefecture. It sets out small hydropower figures from the world (installed capacity by country) to Japan (the national target and prefectural ranking), Saga Prefecture (by municipality) and our own work in Karatsu, as published by the issuing bodies, without conclusions or evaluative wording. The size limit for "small" hydropower differs between sources: the UNIDO report counts plants up to 10 MW (10,000 kW), and the FIT data of Japan's Agency for Natural Resources and Energy (ANRE) group "small and medium hydropower" as four size bands under 30,000 kW. The prefectural ranking on this page adds the two bands "under 200 kW" and "200 kW to under 1,000 kW"; this is our own tally. | Question | Figure | As of | Source | |---|---|---|---| | Installed in Japan, under 1,000 kW (new and transferred certifications) | 250,440.7 kW, 1,023 plants | June 2026 | [ANRE](https://www.fit-portal.go.jp/servlet/servlet.FileDownload?file=015hA000001K8FN) (our tally) | | Top prefecture | Toyama 17,090 kW, 54 plants | June 2026 | [ANRE](https://www.fit-portal.go.jp/servlet/servlet.FileDownload?file=015hA000001K8FN) (our tally) | | Saga Prefecture | 30th, 1,873.6 kW, 12 plants | June 2026 | [ANRE](https://www.fit-portal.go.jp/servlet/servlet.FileDownload?file=015hA000001K8FN) (our tally) | | National target, small and medium hydro | 10.4 GW (FY2030) | June 2025 document | [ANRE](https://www.meti.go.jp/shingikai/enecho/denryoku_gas/saisei_kano/pdf/074_01_00.pdf) | | World small hydropower installed (up to 10 MW) | About 79.0 GW, 64% untapped | WSHPDR 2022 | [UNIDO and ICSHP](https://www.unido.org/sites/default/files/files/2023-05/ENGLISH%20SUMMARY-2022.pdf) | | Japan, up to 10 MW | 3,577 MW, 4th in the world | WSHPDR 2022 | [UNIDO and ICSHP](https://www.unido.org/sites/default/files/files/2023-05/ENGLISH%20SUMMARY-2022.pdf) | "Installed" in the FIT data means purchase of electricity under the scheme has started (ANRE). 1 GW = 1,000 MW = 1,000,000 kW. ## Small hydropower ranking by country (up to 10 MW, WSHPDR 2022) | Rank | Country | Installed (MW) | Potential (MW) | Share developed | |---|---|---|---|---| | 1 | China | 41,985.0 | 63,500.0 | 66.1% | | 2 | USA | 3,681.0 | 10,583.0 | 34.8% | | 3 | Italy | 3,648.4 | 7,073.0 | 51.6% | | **4** | **Japan** | **3,577.0** | **10,330.0** | **34.6%** | | 5 | Norway | 2,924.0 | 7,162.0 | 40.8% | | 6 | France | 2,200.0 | 2,615.0 | 84.1% | | 7 | Spain | 2,145.0 | 2,158.0 | 99.4% | | 8 | Germany | 1,674.0 | 1,830.0 | 91.5% | | 9 | Turkey | 1,662.2 | 4,891.5 | 34.0% | | 10 | Brazil | 1,608.2 | 3,737.8 | 43.0% | Top 10 countries by installed small hydropower capacity up to 10 MW. Potential is the known potential including developed capacity. Share developed is installed divided by potential (our calculation). Countries without data for the 10 MW definition, such as India, are not included. Source: [UNIDO and ICSHP, World Small Hydropower Development Report 2022, Executive Summary attachments (pp. 17 to 19)](https://www.unido.org/sites/default/files/files/2023-05/ENGLISH%20SUMMARY-2022.pdf) According to UNIDO and the International Center on Small Hydro Power (ICSHP), installed small hydropower capacity up to 10 MW is about 79.0 GW worldwide, against a known potential of 221.7 GW including developed capacity, so 64% remains untapped. China accounts for 53% of installed capacity, followed by the United States, Italy, Japan and Norway; together these five countries hold almost 71% ([UNIDO and ICSHP, pp. 5 and 8](https://www.unido.org/sites/default/files/files/2023-05/ENGLISH%20SUMMARY-2022.pdf)). Japan's 3,577 MW up to 10 MW is about 34.6% of its potential of 10,330 MW (our calculation). ## Japan's target for small and medium hydropower (10.4 GW in FY2030) | Item | Figure | As of | |---|---|---| | Small and medium hydro installed (including 9.6 GW from before the FIT) | 10.0 GW | December 2024 (preliminary) | | FY2030 target in the energy mix | 10.4 GW | FY2030 | | Additional capacity needed to reach the target | About 0.4 GW | Over about six years | | Added in the most recent four years or so | 0.2 GW | To December 2024 | | Certified under FIT/FIP but not yet operating | 0.3 GW | December 2024 | | Hydropower share of electricity (FY2040 outlook) | About 8 to 10% | 7.6% in FY2023 (preliminary) | Source: [ANRE, Future renewable energy policy (Material 1, 74th meeting of the subcommittee on large-scale renewable energy introduction and next-generation networks, 3 June 2025)](https://www.meti.go.jp/shingikai/enecho/denryoku_gas/saisei_kano/pdf/074_01_00.pdf), pp. 4 and 31. The FY2040 outlook is from the materials of the Seventh Strategic Energy Plan (February 2025). ANRE notes that the remaining sites for small and medium hydropower lie further into the mountains and take longer to develop, and that about 0.4 GW must be added over about six years to reach the FY2030 target ([ANRE, p. 31](https://www.meti.go.jp/shingikai/enecho/denryoku_gas/saisei_kano/pdf/074_01_00.pdf)). In the FIT data for June 2026, installed small and medium hydropower (under 30,000 kW) was 1.879 GW from 1,048 plants under new certification and 0.242 GW from 262 plants transferred from earlier schemes ([ANRE FIT portal](https://www.fit-portal.go.jp/PublicInfoSummary)). The 250,440.7 kW under 1,000 kW consists of 179,031.1 kW under new certification and 71,409.6 kW transferred (our tally). ## Small hydropower ranking by prefecture (under 1,000 kW, June 2026) | Rank | Prefecture | Installed (kW) | Plants | Of which under 200 kW (kW) | |---|---|---|---|---| | 1 | Toyama | 17,090.0 | 54 | 2,634.9 | | 2 | Gifu | 15,680.5 | 66 | 3,452.7 | | 3 | Nagano | 15,494.2 | 82 | 6,404.7 | | 4 | Hokkaido | 14,532.5 | 34 | 1,066.5 | | 5 | Kagoshima | 14,103.5 | 40 | 1,617.0 | | 6 | Shizuoka | 12,416.0 | 47 | 2,092.2 | | 7 | Yamanashi | 10,579.6 | 39 | 1,732.6 | | 8 | Fukui | 10,269.0 | 36 | 2,538.5 | | 9 | Yamagata | 9,564.9 | 36 | 2,606.5 | | 10 | Fukushima | 8,838.9 | 25 | 1,110.9 | | 11 | Gunma | 8,820.4 | 37 | 2,157.4 | | 12 | Shimane | 8,396.9 | 29 | 2,751.9 | | 13 | Hiroshima | 7,943.4 | 33 | 3,703.4 | | 14 | Okayama | 7,521.3 | 31 | 991.3 | | 15 | Niigata | 6,888.4 | 19 | 1,131.4 | | **30** | **Saga** | **1,873.6** | **12** | **874.6** | Top 15 and Saga. New and transferred certifications added together and ranked by installed capacity (our calculation). Ranked 16th to 20th are Tottori 6,743.1 kW, Oita 6,003.4 kW, Kumamoto 5,696.5 kW, Miyazaki 5,553.0 kW and Akita 4,979.5 kW. Source: [ANRE, Table A: certified and installed capacity by prefecture (June 2026), Tables A1 and A2](https://www.fit-portal.go.jp/servlet/servlet.FileDownload?file=015hA000001K8FN) The seven prefectures of Kyushu rank as follows: Kagoshima 5th (14,103.5 kW), Oita 17th (6,003.4 kW), Kumamoto 18th (5,696.5 kW), Miyazaki 19th (5,553.0 kW), Fukuoka 21st (4,851.3 kW), Saga 30th (1,873.6 kW), Nagasaki 44th (708.9 kW) (our calculation). The top five prefectures together hold 76,900.7 kW, about 30.7% of the national 250,440.7 kW (our calculation). ## Trend in small hydropower capacity (Japan and Saga, 2018 to 2026) | As of | Japan (kW) | Japan (plants) | Saga (kW) | Saga (plants) | |---|---|---|---|---| | Mar 2018 | 101,280.3 | 458 | 417.7 | 5 | | Mar 2019 | 118,083.8 | 536 | 626.0 | 8 | | Mar 2020 | 130,231.0 | 611 | 1,624.7 | 9 | | Mar 2021 | 161,006.8 | 712 | 1,654.7 | 10 | | Mar 2022 | 186,100.1 | 811 | 1,654.7 | 10 | | Mar 2023 | 202,628.8 | 863 | 1,674.6 | 11 | | Mar 2024 | 219,721.2 | 919 | 1,873.6 | 12 | | Mar 2025 | 235,844.8 | 979 | 1,873.6 | 12 | | Mar 2026 | 246,907.2 | 1,016 | 1,873.6 | 12 | | **Jun 2026** | **250,440.7** | **1,023** | **1,873.6** | **12** | Installed capacity under 1,000 kW, new and transferred certifications combined (our tally), at the end of March each year and June 2026. Source: ANRE Table A for each date ([March 2018](https://www.fit-portal.go.jp/servlet/servlet.FileDownload?file=0150K000006oQgJ), [March 2022](https://www.fit-portal.go.jp/servlet/servlet.FileDownload?file=0150K00000AylFx), [March 2026](https://www.fit-portal.go.jp/servlet/servlet.FileDownload?file=015hA000000lPEH), [June 2026](https://www.fit-portal.go.jp/servlet/servlet.FileDownload?file=015hA000001K8FN) and others; all editions on the [FIT portal](https://www.fit-portal.go.jp/PublicInfoSummary)) Installed capacity under 1,000 kW in Japan rose from 101,280.3 kW in March 2018 to 250,440.7 kW in June 2026, about 2.47 times (our calculation). Saga Prefecture went from 417.7 kW (5 plants) in March 2018 to 1,873.6 kW (12 plants) in March 2024 and has been unchanged since. ## Small hydropower in Saga Prefecture and Karatsu City (by municipality, June 2026) | Municipality | Installed (kW) | Plants | |---|---|---| | **Karatsu City** | **999.0** | **1** | | Tara Town | 248.0 | 2 | | Kanzaki City | 199.0 | 1 | | Kashima City | 196.0 | 1 | | Saga City | 132.7 | 4 | | Genkai Town | 49.0 | 1 | | Yoshinogari Town | 30.0 | 1 | | Ogi City | 19.9 | 1 | | Total | 1,873.6 | 12 | Installed capacity under 1,000 kW, new and transferred certifications combined (our tally). Only the eight municipalities with installations. Source: [ANRE, Table B: certified and installed capacity by municipality (June 2026), Tables B1 and B2](https://www.fit-portal.go.jp/servlet/servlet.FileDownload?file=015hA000001K8Ib) Within Saga Prefecture, plants under 1,000 kW are found in eight municipalities. Karatsu City's 999 kW (one plant in the 200 kW to under 1,000 kW band) is the largest, about 53.3% of the prefectural total (our calculation). Karatsu City also has one plant of 2,100 kW in the 1,000 kW to under 5,000 kW band (specified hydropower) ([ANRE Table B](https://www.fit-portal.go.jp/servlet/servlet.FileDownload?file=015hA000001K8Ib)). ## An example from Karatsu (our work) | Item | Value | As of | |---|---|---| | **Small hydro generator in the Yokomakura irrigation channel** | **1 unit** | **Installed 7 October 2026** | | Output and operation | being recorded; to be published once compiled | | Our generator charges a battery that powers electric fences, and is recorded separately from the FIT figures above, which cover plants selling electricity under the scheme. Source: our records At Yokomakura, a nature symbiosis site in Ochi, Karatsu City, we installed a small hydro generator (Pikopika 10) in the irrigation channel that waters the rice fields on 7 October 2026. Its electricity powers electric fences against wildlife damage. The work is supported by the Japan Fund for Global Environment of the Environmental Restoration and Conservation Agency (ERCA), and we are now recording output and operation. The project is described on [Green Infrastructure (small hydropower, wildlife-damage control and biodiversity at Yokomakura)](https://karatsu-f-f.com/en/green-infrastructure.html), and the site itself on [Nature Positive and our OECM site](https://karatsu-f-f.com/en/nature-positive.html). For visits to the small hydro generator and electric fences at Yokomakura, training or partnerships with companies, see [Citing this page and enquiries](#contact) below. ## Frequently asked questions ### Q1. How much small hydropower does Japan have? Hydropower plants under 1,000 kW selling electricity under FIT/FIP numbered 1,023 with 250,440.7 kW at the end of June 2026 (our tally of ANRE data). Small and medium hydropower, for which the government sets a target, stood at 10.0 GW in December 2024 including plants from before the FIT, against a FY2030 target of 10.4 GW. ### Q2. Which prefectures have the most small hydropower? By installed capacity under 1,000 kW (June 2026): 1 Toyama 17,090 kW, 2 Gifu 15,680.5 kW, 3 Nagano 15,494.2 kW, 4 Hokkaido 14,532.5 kW, 5 Kagoshima 14,103.5 kW (our tally). ### Q3. Which countries have the most small hydropower? For plants up to 10 MW, China has the most with 41,985 MW (53% of the world), followed by the United States, Italy, Japan and Norway. The world total is about 79.0 GW (UNIDO and ICSHP, WSHPDR 2022). ### Q4. How much small hydropower is there in Saga Prefecture? Installed capacity under 1,000 kW was 1,873.6 kW from 12 plants in June 2026, 30th among prefectures. Karatsu City's 999 kW is the largest in the prefecture, about 53.3% of the total (our calculation). ### Q5. What size counts as small hydropower? It depends on the source. The UNIDO report counts plants up to 10 MW (10,000 kW); ANRE's FIT data treat "small and medium hydropower" as under 30,000 kW. The prefectural ranking on this page adds the two FIT bands under 1,000 kW. ### Q6. Is small hydropower increasing in Japan? Installed capacity under 1,000 kW grew from 101,280.3 kW in March 2018 to 250,440.7 kW in June 2026, about 2.47 times (our calculation). ANRE notes that remaining sites lie further into the mountains and take longer to develop. ### Q7. Can I see small hydropower in Karatsu? We installed a small hydro generator in the irrigation channel at Yokomakura in Ochi, Karatsu City, to power electric fences against wildlife damage (7 October 2026). Please use our contact page to ask about visits or training. ## Source register | Document | Publisher | Date | URL | Accessed | |---|---|---|---|---| | Certified and installed capacity by prefecture, end of June 2026 (Table A) | Agency for Natural Resources and Energy | 2026-11-19 (published) | [https://www.fit-portal.go.jp/servlet/servlet.FileDownload?file=015hA000001K8FN](https://www.fit-portal.go.jp/servlet/servlet.FileDownload?file=015hA000001K8FN) | 2026-11-19 | | Certified and installed capacity by municipality, end of June 2026 (Table B) | Agency for Natural Resources and Energy | 2026-11-19 (published) | [https://www.fit-portal.go.jp/servlet/servlet.FileDownload?file=015hA000001K8Ib](https://www.fit-portal.go.jp/servlet/servlet.FileDownload?file=015hA000001K8Ib) | 2026-11-19 | | Certified and installed capacity by prefecture, end of March 2018 to 2026 (Table A) | Agency for Natural Resources and Energy | each date | [https://www.fit-portal.go.jp/PublicInfoSummary](https://www.fit-portal.go.jp/PublicInfoSummary) | 2026-11-19 | | FIT/FIP information disclosure website | Agency for Natural Resources and Energy | 2026-11-19 (updated) | [https://www.fit-portal.go.jp/PublicInfoSummary](https://www.fit-portal.go.jp/PublicInfoSummary) | 2026-11-19 | | Future renewable energy policy (Material 1, 74th meeting of the subcommittee on large-scale renewable energy introduction and next-generation networks) | Agency for Natural Resources and Energy | 2025-06-03 | [https://www.meti.go.jp/shingikai/enecho/denryoku_gas/saisei_kano/pdf/074_01_00.pdf](https://www.meti.go.jp/shingikai/enecho/denryoku_gas/saisei_kano/pdf/074_01_00.pdf) | 2026-11-19 | | World Small Hydropower Development Report 2022, Executive Summary | UNIDO and ICSHP | 2023-05 (posted) | [https://www.unido.org/sites/default/files/files/2023-05/ENGLISH%20SUMMARY-2022.pdf](https://www.unido.org/sites/default/files/files/2023-05/ENGLISH%20SUMMARY-2022.pdf) | 2026-11-19 | | World Small Hydropower Development Report 2022 (web page) | UNIDO | web page | [https://www.unido.org/WSHPDR2022](https://www.unido.org/WSHPDR2022) | 2026-11-19 | ## Notes on reading the figures "Installed" in the FIT data means that purchase of electricity under the Renewable Energy Act has started; it excludes plants for own use outside the scheme and plants that ran before the scheme and did not transfer. New certifications are plants certified after the scheme began; transferred certifications are plants already generating when it began that moved into it. The prefectural and municipal values add ANRE's "under 200 kW" and "200 kW to under 1,000 kW" capacities in Tables A and B; this is our own tally, not a figure ANRE publishes as "small hydropower". ANRE notes that some data are still being checked and contain small errors. UNIDO's figures are estimates from national sources, exclude countries without data for the 10 MW definition (such as India) and refer to different years by country. The national 10.4 GW target is ANRE's figure for "small and medium hydropower", not for plants under 1,000 kW alone. The ANRE document does not state a size limit for this category, and its 10.0 GW installed figure includes 9.6 GW from before the FIT, so it is counted differently from the FIT data tallies. ## What this page does not cover For renewable energy and biodiversity, including dam operation, see [Renewable energy and biodiversity](https://karatsu-f-f.com/en/ipbes-renewables.html); for national green infrastructure figures, [Green infrastructure data](https://karatsu-f-f.com/en/green-infrastructure-data.html); and for CO2 emissions and the share of renewables, [CO2 emissions and decarbonisation data](https://karatsu-f-f.com/en/carbon-neutral-data.html). This page does not cover lists of hydropower plants of 1,000 kW or more, pumped storage, electricity generated (kWh) by prefecture, purchase prices or the operators of individual plants. ## Citing this page and enquiries To cite figures from this page, or to ask about visits and training at the Yokomakura small hydro generator and electric fences or partnerships with companies, please use our [contact page](https://karatsu-f-f.com/en/contact.html) or write to [info@karatsu-f-f.com](mailto:info@karatsu-f-f.com). ## About this page By Hiroaki Kojima (Vice Director, [Karatsu Farm & Food](https://karatsu-f-f.com/en/index.html)) / Contact: [info@karatsu-f-f.com](mailto:info@karatsu-f-f.com) ([contact page](https://karatsu-f-f.com/en/contact.html)) / Published: 20 November 2026 / Markdown: [small-hydro-data.md](https://karatsu-f-f.com/en/small-hydro-data.md) This page is made together with AI. See [this data bank and AI](https://karatsu-f-f.com/en/data-bank.html#ai) for how. ## Related links ▶ [Karatsu Data Bank](https://karatsu-f-f.com/en/data-bank.html) ▶ [Green Infrastructure at Yokomakura](https://karatsu-f-f.com/en/green-infrastructure.html) ▶ [Nature Positive and our OECM site](https://karatsu-f-f.com/en/nature-positive.html) ▶ [Green infrastructure data](https://karatsu-f-f.com/en/green-infrastructure-data.html) ▶ [Renewable energy and biodiversity](https://karatsu-f-f.com/en/ipbes-renewables.html) ▶ [CO2 emissions and decarbonisation data](https://karatsu-f-f.com/en/carbon-neutral-data.html) ▶ [小水力発電の都道府県ランキング2026(日本語)](https://karatsu-f-f.com/small-hydro-data.html)