# Solar Panel Waste, Recycling and Lifespan in Japan 2026: Panels Last About 20-30 Years, Waste Up to About 500,000 t a Year from the Late 2030s. Capacity by Prefecture, Saga and Karatsu By Karatsu Farm & Food (Karatsu Data Bank) / HTML: https://karatsu-f-f.com/en/solar-panel-waste-data.html / Published: 2026-11-20 - Solar panel lifespan: about 20-30 years (MOE and METI joint council meeting report, March 2025) - Japan's end-of-life panels: rising from the late 2030s to up to about 500,000 t a year (11th joint meeting, October 2026 estimate) - Dedicated recycling facilities: 87, about 130,000 t a year (November 2025; the same document also gives about 150,000 t). Recycling ¥8,000-12,000/kW vs landfill from about ¥2,000/kW - Law: Act on Promoting the Recycling of Solar Cell Waste (passed 29 May 2026, promulgated 5 June). Decommissioning cost reserve from 1 July 2022 (FIT/FIP, 10 kW or more) - Installed capacity (FIT/FIP, end of June 2026): 78,386 MW; 1 Ibaraki, 2 Fukushima, 3 Chiba; Saga 35th (775 MW, sorted by us) - World: cumulative waste of about 60-78 million t by 2050 (IRENA and IEA-PVPS, 2016). The EU brought panels under the WEEE Directive in 2012 - Karatsu (our work): a small hydropower generator installed at Yokomakura on 7 October 2026 powers an electric fence (output being recorded) ## How long do solar panels last, and when will panel waste rise? (2026) **Solar panels last about 20 to 30 years. In Japan, end-of-life panels are expected to increase from the late 2030s and reach up to about 500,000 tonnes a year ([joint meeting of the Central Environment Council and the Industrial Structure Council, report on a solar panel recycling system](https://www.env.go.jp/content/000302385.pdf), March 2025; [11th joint meeting, Document 3](https://www.env.go.jp/council/content/03recycle03/000433714.pdf), October 2026). If all of it were landfilled directly, it would equal about 5% of Japan's final disposal of industrial waste in FY2021. As of November 2025, Japan had 87 facilities dedicated to recycling used panels, with a capacity of about 130,000 tonnes a year ([10th joint meeting, Document 1](https://www.env.go.jp/council/content/03recycle03/000371843.pdf)).** This page was made by Karatsu Farm & Food as part of the Karatsu Data Bank. It looks at solar panel waste, recycling and lifespan worldwide (waste estimates for 2030 and 2050, the EU rules), in Japan (the outlook, recycling facilities and costs, how panels are processed, the 2026 Act, the decommissioning cost reserve, installed capacity over time and by prefecture), in Saga and in Karatsu. Local ordinances regulating solar installations and the links between solar power and nature are on our page on [renewable energy and biodiversity](https://karatsu-f-f.com/en/ipbes-renewables.html). | Question | Figure | Period | Source | |---|---|---|---| | Solar panel lifespan | about 20-30 years | March 2025 | [joint meeting report](https://www.env.go.jp/content/000302385.pdf) | | Japan's end-of-life panel outlook | up to about 500,000 t a year (rising from the late 2030s) | October 2026 estimate | [11th joint meeting, Doc. 3](https://www.env.go.jp/council/content/03recycle03/000433714.pdf) | | Dedicated recycling facilities | 87, capacity about 130,000 t a year | November 2025 | [10th joint meeting, Doc. 1](https://www.env.go.jp/council/content/03recycle03/000371843.pdf) | | Recycling vs landfill cost | ¥8,000-12,000/kW vs from about ¥2,000/kW | June 2026 | [MOE outline of the Act](https://www.env.go.jp/content/000404704.pdf) | | Law to promote recycling | Act on Promoting the Recycling of Solar Cell Waste | passed 29 May 2026 | [e-Gov](https://laws.e-gov.go.jp/law/508AC0000000033) | | Global cumulative waste (2050) | about 60-78 million t | 2016 estimate | [IRENA and IEA-PVPS](https://www.irena.org/-/media/Files/IRENA/Agency/Publication/2016/IRENA_IEAPVPS_End-of-Life_Solar_PV_Panels_2016.pdf) | | Saga's rank in installed capacity | 35th (775 MW) | end of June 2026 | [Agency for Natural Resources and Energy](https://www.fit-portal.go.jp/PublicInfoSummary) (sorted by us) | Installed capacity covers only facilities whose power is bought under the FIT/FIP schemes; facilities outside the schemes (such as self-consumption) are not included. Global cumulative waste is given for two scenarios: a 30-year lifetime with no early failures, and one that includes early failures. ## How much solar panel waste will the world produce? (2030 and 2050 estimates) In a 2016 report, the International Renewable Energy Agency (IRENA) and the IEA Photovoltaic Power Systems Programme (IEA-PVPS) estimated global cumulative end-of-life panel waste under two scenarios. With a 30-year lifetime and no early failures (Regular-loss), it reaches 1.7 million tonnes in 2030 and about 60 million tonnes in 2050; allowing for infant, mid-life and wear-out failures (Early-loss), 8 million tonnes in 2030 and 78 million tonnes in 2050. The report says actual volumes will most likely fall between the two ([IRENA and IEA-PVPS, End-of-Life Management: Solar Photovoltaic Panels](https://www.irena.org/-/media/Files/IRENA/Agency/Publication/2016/IRENA_IEAPVPS_End-of-Life_Solar_PV_Panels_2016.pdf), p. 32). | Country | 2030 Regular-loss (t) | 2030 Early-loss (t) | 2050 Regular-loss (t) | 2050 Early-loss (t) | |---|---|---|---|---| | China | 200,000 | 1,500,000 | 13,500,000 | 19,900,000 | | United States | 170,000 | 1,000,000 | 7,500,000 | 10,000,000 | | **Japan** | **200,000** | **1,000,000** | **6,500,000** | **7,600,000** | | India | 50,000 | 325,000 | 4,400,000 | 7,500,000 | | Germany | 400,000 | 1,000,000 | 4,300,000 | 4,300,000 | | World | 1,700,000 | 8,000,000 | 60,000,000 | 78,000,000 | Estimated cumulative waste volumes of end-of-life PV panels, as rounded in the report. Japan in bold. Source: [IRENA and IEA-PVPS (2016)](https://www.irena.org/-/media/Files/IRENA/Agency/Publication/2016/IRENA_IEAPVPS_End-of-Life_Solar_PV_Panels_2016.pdf), Table 6 (p. 34). IEA-PVPS's 2025 report makes no new estimate of its own, but presents the 2016 figures alongside newer ones. In the 1.5°C scenario of IRENA's World Energy Transitions Outlook 2022, global cumulative waste reaches 4 million tonnes in 2030, about 50 million tonnes in 2040 and over 200 million tonnes in 2050; the IEA's Special Report on Solar PV Global Supply Chains (July 2022) gives 400,000-600,000 tonnes by 2030 and 11-15 million tonnes by 2040 (pp. 10-11). For China it cites a cumulative 55 million tonnes (Regular-loss) to 66 million tonnes (Early-loss) by 2050. In Europe, 18 countries collected 48,395 tonnes of PV panel waste in 2022 under the EU directive on waste electrical and electronic equipment (WEEE) ([IEA-PVPS, Status of PV Module Recycling in IEA PVPS Task 12 Countries](https://iea-pvps.org/wp-content/uploads/2025/07/IEA-PVPS-T12-31-2025-REPORT-Status-Module-Recycling.pdf), September 2025, pp. 10, 14, 62; Eurostat data). The 2012 WEEE Directive (2012/19/EU) brought solar panels into scope. Its annexes list photovoltaic panels under category 4, "Consumer equipment and photovoltaic panels", in the transitional period and as an example of category 4, "Large equipment", from 15 August 2018, and Article 5(1) names photovoltaic panels for separate collection ([Directive 2012/19/EU](https://eur-lex.europa.eu/legal-content/EN/TXT/HTML/?uri=CELEX:32012L0019)). The previous directive (2002/96/EC) had no provisions for PV; the new one entered into force on 13 August 2012, with transposition by 14 February 2014 ([IRENA and IEA-PVPS](https://www.irena.org/-/media/Files/IRENA/Agency/Publication/2016/IRENA_IEAPVPS_End-of-Life_Solar_PV_Panels_2016.pdf), p. 52). ## Japan's outlook for end-of-life solar panels (lifespan and peak, 2026) In its March 2025 report, a joint meeting of councils under the Ministry of the Environment (MOE) and the Ministry of Economy, Trade and Industry (METI) said solar panels last about 20 to 30 years, and estimated that discharges would rise from the late 2030s and peak at about 500,000 tonnes a year. That is comparable to the volumes now processed for cars and four types of home appliances; landfilled directly, it would equal about 5% of Japan's final disposal of industrial waste in FY2021 (8.69 million tonnes) ([joint meeting report](https://www.env.go.jp/content/000302385.pdf), p. 1; [reference materials](https://www.env.go.jp/content/000302386.pdf), p. 2). The estimate covers discharges from failures, from the end of FIT/FIP purchase periods and for economic reasons, and conservatively does not assume that longer use or recycling will smooth them out. Of the maximum of about 500,000 tonnes, panels already installed account for about 400,000 tonnes (p. 2). At the 11th joint meeting on 6 October 2026, a refined estimate was presented that updates failure rates from field surveys and adds a reuse rate (15%). It shows lower discharges than previously assumed up to the 2030s, but continued discharges after the peak; discharges still rise from the late 2030s and reach up to about 500,000 tonnes a year ([11th joint meeting, Document 3](https://www.env.go.jp/council/content/03recycle03/000433714.pdf), p. 3). Annual figures appear only in charts, with no table, so this page does not give them. The draft basic policy in the same document aims to bring recycling costs to or below landfill costs by the peak expected in the 2040s (p. 4). ## Solar panel recycling facilities and costs in Japan (2025) An MOE survey of the authorities that issue waste licences (47 prefectures and 82 designated cities) found 87 facilities dedicated to recycling used panels as of November 2025, with a capacity of about 130,000 tonnes a year; eight prefectures had none ([10th joint meeting, Document 1](https://www.env.go.jp/council/content/03recycle03/000371843.pdf), p. 6; [11th joint meeting, Document 3](https://www.env.go.jp/council/content/03recycle03/000433714.pdf), p. 9). The FY2024 survey found 67 facilities and about 110,000 tonnes a year ([reference materials](https://www.env.go.jp/content/000302386.pdf), p. 3). Capacity assumes operation of 8 hours a day for 240 days a year. Under current law, recycling of discarded panels is not required; they are handled under the Waste Management Act ([reference materials](https://www.env.go.jp/content/000302386.pdf), p. 1). A survey of nine companies found recycling costs (excluding dismantling, removal, collection and transport) of ¥8,000-12,000/kW (p. 17), against landfill costs from about ¥2,000/kW, a gap described as still large ([MOE, outline of the Act on Promoting the Recycling of Solar Cell Waste](https://www.env.go.jp/content/000404704.pdf), p. 2). | Item | Cost | Basis | Source | |---|---|---|---| | Recycling cost (excluding dismantling, removal, collection and transport) | ¥8,000-12,000/kW | survey of 9 companies | [reference materials, p. 17](https://www.env.go.jp/content/000302386.pdf) | | Landfill cost | from about ¥2,000/kW | | [outline of the Act, p. 2](https://www.env.go.jp/content/000404704.pdf) | | NEDO technology target (processing cost) | ¥2,000/kW or less | FY2029 | [10th meeting, Doc. 1](https://www.env.go.jp/council/content/03recycle03/000371843.pdf) | | Decommissioning cost of a plant (concrete foundations, median) | about ¥13,700/kW | 2019 survey (40 companies) | [reference materials, p. 14](https://www.env.go.jp/content/000302386.pdf) | | Decommissioning cost of a plant (screw foundations, median) | about ¥10,600/kW | same | [reference materials, p. 14](https://www.env.go.jp/content/000302386.pdf) | | of which panel processing and final disposal | about ¥2,100/kW | same | [reference materials, p. 14](https://www.env.go.jp/content/000302386.pdf) | The nine-company recycling cost survey assumes 250 W and 20 kg per panel. NEDO (New Energy and Industrial Technology Development Organization) achieved a processing cost of about ¥5,000/kW or less in FY2018 and in FY2024 completed development of separation technology expected to cost about ¥3,000/kW or less with 80% or more resource recovery. Sources: [joint meeting reference materials](https://www.env.go.jp/content/000302386.pdf) (March 2025), [10th joint meeting, Document 1](https://www.env.go.jp/council/content/03recycle03/000371843.pdf) (January 2026), [MOE outline of the Act](https://www.env.go.jp/content/000404704.pdf) (June 2026). ## How are used panels processed? (FY2024, 51 companies) A survey of intermediate processors handling, reusing or recycling panels (51 responded; FY2024 results) found 255,000 panels (5,046 tonnes) collected. By weight, about 20% (20.1%, 51,000 panels or 1,015 tonnes) was reused and about 80% (79.7%) went to intermediate processing; as shares of the collected total, 50.4% was recycled (2,543 tonnes), 22.3% went to heat recovery and 7.0% was simply crushed ([11th joint meeting, Document 3](https://www.env.go.jp/council/content/03recycle03/000433714.pdf), p. 10, based on a Nomura Research Institute report). The document assumes that other processors outside the survey also simply crush panels. | Category | Amount | Share of collected (by weight) | |---|---|---| | Collected | 255,000 panels (5,046 t) | 100% | | Reuse | 51,000 panels (1,015 t) | 20.1% | | Intermediate processing | 204,000 panels (4,021 t) | 79.7% | | of which recycling | 130,000 panels (2,543 t) | 50.4% | | of which heat recovery | 56,000 panels (1,127 t) | 22.3% | | of which simple crushing | 18,000 panels (352 t) | 7.0% | Shares as given in the document (by weight). Source: [11th joint meeting, Document 3](https://www.env.go.jp/council/content/03recycle03/000433714.pdf) (October 2026, p. 10). ## What are solar panels made of? (share by weight) Most of a panel's weight is glass. MOE materials give the weight shares of a silicon panel from NEDO's PV Challenges 2020 as glass 62.5%, aluminium 15.7%, plastics etc. 17.7%, cells (silicon) 3.4% and electrode metals (copper, silver, solder etc.) 0.8%, describing glass as about 60% of the weight ([reference materials](https://www.env.go.jp/content/000302386.pdf), p. 8). The 2016 IRENA and IEA-PVPS report gives glass as about 76% of a crystalline silicon panel ([IRENA and IEA-PVPS](https://www.irena.org/-/media/Files/IRENA/Agency/Publication/2016/IRENA_IEAPVPS_End-of-Life_Solar_PV_Panels_2016.pdf), p. 41). The sources differ, so both are shown. | Material | MOE materials (NEDO figures) | IRENA and IEA-PVPS (2016) | |---|---|---| | Glass | 62.5% | about 76% | | Aluminium (mainly frame) | 15.7% | about 8% | | Plastics etc. (encapsulant, backsheet) | 17.7% | about 10% | | Cells (silicon) | 3.4% | about 5% | | Metals (copper, silver etc.) | 0.8% | copper about 1%, silver under 0.1%, other metals | Shares by weight of crystalline silicon panels. Sources: [joint meeting reference materials](https://www.env.go.jp/content/000302386.pdf), p. 8; [IRENA and IEA-PVPS (2016)](https://www.irena.org/-/media/Files/IRENA/Agency/Publication/2016/IRENA_IEAPVPS_End-of-Life_Solar_PV_Panels_2016.pdf), p. 41. The share that can go to recycling and heat recovery (by weight) depends on the method: about 90-95% for heat treatment, about 75-95% for glass cutting, about 60-90% for glass crushing, and from about 50% for general shredders with sorting ([MOE outline of the Act](https://www.env.go.jp/content/000404704.pdf), p. 8). ## Japan's solar panel recycling law (2026) The Act on Promoting the Recycling of Solar Cell Waste (Act No. 33 of 2026) was approved by the Cabinet on 3 April 2026, passed on 29 May and promulgated on 5 June ([METI press release](https://www.meti.go.jp/press/2026/04/20260403002/20260403002.html); [MOE, solar panel recycling](https://www.env.go.jp/recycle/recycling/renewable/page_00345.html); [e-Gov](https://laws.e-gov.go.jp/law/508AC0000000033)). Most of it takes effect on a date set by cabinet order within 18 months of promulgation. It is administered by the Minister of the Environment and the Minister of Economy, Trade and Industry. | Item | Content | |---|---| | Basic policy | The national government sets a basic policy | | Those discarding large amounts of business-use solar cells | Solar power operators and others must take steps toward recycling in line with national criteria (guidance and advice, recommendations and orders). Disposal plans must be notified in advance (in principle no discharge for 30 days after acceptance) | | Approval of recycling business plans | The government approves cost-efficient recycling business plans, which then do not need prefectural waste licences | | Manufacturers, importers and sellers | Environmentally conscious design and information on contained substances | | Review | A provision to consider extending obligations to a wider range of dischargers (supplementary provisions) | | "Solar cells" covered | Plate-shaped units containing glass parts, at or above a weight set by cabinet order | Source: [MOE, outline of the Act on Promoting the Recycling of Solar Cell Waste](https://www.env.go.jp/content/000404704.pdf) (June 2026, pp. 1, 3 and 6). Work on cabinet orders and the basic policy began at the 11th joint meeting on 6 October 2026. ## Japan's decommissioning cost reserve for solar (from July 2022) To make sure money is available to dismantle and remove plants, a reserve for decommissioning costs was created by the amended Renewable Energy Act under the Energy Supply Resilience Act passed in June 2020. It covers all FIT and FIP-approved solar projects of 10 kW or more. In principle, the reserve is held externally: amounts are deducted from monthly payments and set aside with the Organization for Cross-regional Coordination of Transmission Operators (OCCTO). Saving runs for the last 10 years of the purchase (or premium) period, and the earliest projects began on 1 July 2022 ([Agency for Natural Resources and Energy, decommissioning cost reserve for solar](https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/dl/fip_2020/fip_document03.pdf), September 2021). Systems under 10 kW are excluded on the assumption that they are disposed of properly when houses are demolished ([reference materials](https://www.env.go.jp/content/000302386.pdf), p. 13). Before the scheme, in periodic reports at the end of January 2019 (20 kW or more), 83% said they were not saving, 12% were saving and 4% had finished saving ([Agency for Natural Resources and Energy](https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/dl/fip_2020/fip_document03.pdf)). We could not find published statistics on the number of projects covered or the total reserved, so they are not given. | Year of approval | Standard reserve amount (¥/kWh) | |---|---| | FY2012 | 1.62 | | FY2013 | 1.40 | | FY2014 | 1.28 | | FY2015 | 1.25 | | FY2016 | 1.09 | | FY2017 | 0.99 | | FY2018 | 0.80 | | FY2019 | 0.66 | | FY2020-2021 (10-50 kW) | 1.33 | | FY2020-2021 (50 kW or more) | 0.66 | Amount reserved per kWh generated. FY2017-FY2019 values are for projects outside the auctions (auctioned projects have different amounts). For FY2012 approvals (purchase price ¥40/kWh), decommissioning costs of ¥17,000/kW give ¥1.62/kWh. Source: [Agency for Natural Resources and Energy, decommissioning cost reserve for solar](https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/dl/fip_2020/fip_document03.pdf) (17 September 2021). ## Installed solar capacity in Japan, 2018-2026 (FIT/FIP) | As of | Newly approved (MW) | Transferred (MW) | Total (MW) | Saga (MW) | Saga's rank | |---|---|---|---|---|---| | Mar 2018 | 38,934 | 4,977 | 43,911 | 547 | 30 | | Mar 2019 | 44,569 | 4,980 | 49,549 | 597 | 33 | | Mar 2020 | 50,208 | 4,984 | 55,192 | 627 | 33 | | Mar 2021 | 55,952 | 4,990 | 60,942 | 678 | 34 | | Mar 2022 | 60,536 | 4,991 | 65,527 | 702 | 34 | | Mar 2023 | 65,132 | 4,993 | 70,125 | 726 | 34 | | Mar 2024 | 68,228 | 4,994 | 73,222 | 744 | 34 | | Mar 2025 | 71,038 | 4,993 | 76,030 | 761 | 35 | | Mar 2026 | 73,005 | 4,992 | 77,997 | 772 | 35 | | **Jun 2026** | **73,393** | **4,992** | **78,386** | **775** | **35** | Installed capacity of solar facilities (under and over 10 kW) whose power is bought under the FIT/FIP schemes; facilities outside the schemes (such as self-consumption) are not included. Saga's rank is our sorting. Source: [Agency for Natural Resources and Energy, information disclosure website under the Renewable Energy Act](https://www.fit-portal.go.jp/PublicInfoSummary), Table A by prefecture (each date; June 2026 figures published 19 November 2026). Installed FIT/FIP solar capacity rose from 43,911 MW at the end of March 2018 to 78,386 MW at the end of June 2026 ([Agency for Natural Resources and Energy](https://www.fit-portal.go.jp/PublicInfoSummary)). Of installed capacity of FIT/FIP-approved facilities at the end of March 2024, 15,357 MW (21.0%) was under 10 kW and 57,865 MW (79.0%) 10 kW or more ([reference materials](https://www.env.go.jp/content/000302386.pdf), p. 5). ## Installed solar capacity by prefecture (end of June 2026) | Rank | Prefecture | Installed (MW) | under 10 kW | 10 kW or more | Share of Japan | |---|---|---|---|---|---| | 1 | Ibaraki | 4,845 | 622 | 4,223 | 6.18% | | 2 | Fukushima | 3,729 | 352 | 3,378 | 4.76% | | 3 | Chiba | 3,676 | 783 | 2,894 | 4.69% | | 4 | Aichi | 3,466 | 1,424 | 2,042 | 4.42% | | 5 | Tochigi | 3,385 | 460 | 2,925 | 4.32% | | 6 | Hyogo | 3,257 | 707 | 2,549 | 4.15% | | 7 | Mie | 3,057 | 388 | 2,668 | 3.90% | | 8 | Gunma | 2,920 | 457 | 2,463 | 3.72% | | 9 | Fukuoka | 2,746 | 806 | 1,940 | 3.50% | | 10 | Shizuoka | 2,727 | 838 | 1,888 | 3.48% | | 11 | Kagoshima | 2,641 | 343 | 2,298 | 3.37% | | 12 | Miyagi | 2,611 | 382 | 2,230 | 3.33% | | 13 | Okayama | 2,564 | 421 | 2,143 | 3.27% | | 14 | Hokkaido | 2,404 | 308 | 2,095 | 3.07% | | 15 | Saitama | 2,232 | 958 | 1,274 | 2.85% | | 16 | Kumamoto | 2,119 | 457 | 1,661 | 2.70% | | 17 | Nagano | 1,946 | 544 | 1,402 | 2.48% | | 18 | Hiroshima | 1,945 | 478 | 1,467 | 2.48% | | 19 | Gifu | 1,785 | 420 | 1,365 | 2.28% | | 20 | Miyazaki | 1,769 | 290 | 1,479 | 2.26% | | 21 | Yamaguchi | 1,693 | 283 | 1,410 | 2.16% | | 22 | Oita | 1,644 | 245 | 1,400 | 2.10% | | 23 | Osaka | 1,361 | 707 | 654 | 1.74% | | 24 | Iwate | 1,232 | 197 | 1,035 | 1.57% | | 25 | Kanagawa | 1,102 | 737 | 365 | 1.41% | | 26 | Shiga | 1,091 | 311 | 780 | 1.39% | | 27 | Nagasaki | 1,063 | 247 | 816 | 1.36% | | 28 | Tokyo | 1,047 | 882 | 165 | 1.34% | | 29 | Ehime | 1,029 | 270 | 759 | 1.31% | | 30 | Aomori | 1,007 | 97 | 911 | 1.29% | | 31 | Kagawa | 998 | 205 | 793 | 1.27% | | 32 | Wakayama | 904 | 172 | 732 | 1.15% | | 33 | Tokushima | 880 | 142 | 738 | 1.12% | | 34 | Yamanashi | 810 | 208 | 602 | 1.03% | | **35** | **Saga** | **775** | **219** | **555** | **0.99%** | | 36 | Kyoto | 715 | 266 | 449 | 0.91% | | 37 | Nara | 696 | 222 | 474 | 0.89% | | 38 | Ishikawa | 694 | 95 | 599 | 0.89% | | 39 | Kochi | 544 | 118 | 426 | 0.69% | | 40 | Niigata | 535 | 129 | 406 | 0.68% | | 41 | Okinawa | 464 | 155 | 309 | 0.59% | | 42 | Tottori | 459 | 87 | 372 | 0.59% | | 43 | Shimane | 431 | 101 | 330 | 0.55% | | 44 | Yamagata | 387 | 101 | 286 | 0.49% | | 45 | Toyama | 372 | 96 | 276 | 0.47% | | 46 | Akita | 336 | 59 | 277 | 0.43% | | 47 | Fukui | 295 | 80 | 215 | 0.38% | | | Japan | 78,386 | 17,869 | 60,517 | 100.00% | FIT/FIP facilities only; facilities outside the schemes are not included. Newly approved plus transferred. Ranks, subtotals and shares are our calculation; the Agency does not publish them as rankings. Saga in bold. Source: [Agency for Natural Resources and Energy, Table A by prefecture](https://www.fit-portal.go.jp/PublicInfoSummary) (end of June 2026). ## Solar panels and recycling facilities in Saga Prefecture (2026) Saga's installed FIT/FIP solar capacity was 775 MW at the end of June 2026 (219 MW under 10 kW, 555 MW 10 kW or more), 0.99% of Japan and 35th of 47 prefectures. Among the eight prefectures of Kyushu and Okinawa the order was Fukuoka 9th, Kagoshima 11th, Kumamoto 16th, Miyazaki 20th, Oita 22nd, Nagasaki 27th, Saga 35th, Okinawa 41st ([Agency for Natural Resources and Energy](https://www.fit-portal.go.jp/PublicInfoSummary), sorted by us). It has grown from 547 MW at the end of March 2018 (trend table above). Facilities in Saga dedicated to recycling used panels rose from two (1,656 tonnes a year) in FY2024 to three (2,112 tonnes a year) as of November 2025. The same documents put the weight of panels installed in Saga's peak installation year, 2014, at 9,124 tonnes ([reference materials](https://www.env.go.jp/content/000302386.pdf), p. 3; [11th joint meeting, Document 3](https://www.env.go.jp/council/content/03recycle03/000433714.pdf), p. 9). ## An example from Karatsu: small hydropower and an electric fence at Yokomakura (our work) On 7 October 2026, at Yokomakura in Ochi, Karatsu, we installed a small hydropower generator driven by the flow of a water channel. It sends power through a battery to an electric fence against wildlife damage. Output is being recorded. See [green infrastructure in Kyushu](https://karatsu-f-f.com/en/green-infrastructure.html). For site visits, training or corporate partnerships, see "[Citing this page and enquiries](#contact)" below. ## Frequently asked questions ### Q1. How long do solar panels last? The March 2025 report of the MOE and METI joint council meeting says about 20 to 30 years. The 2016 IRENA and IEA-PVPS estimates assume a 30-year lifetime. ### Q2. When will solar panel waste increase in Japan, and by how much? The October 2026 estimate expects discharges to rise from the late 2030s and reach up to about 500,000 tonnes a year. Landfilled directly, that would equal about 5% of Japan's final disposal of industrial waste in FY2021. ### Q3. Can solar panels be recycled? How many facilities are there? As of November 2025, Japan had 87 facilities dedicated to recycling used panels, with a capacity of about 130,000 tonnes a year; eight prefectures had none (MOE survey). Another page of the same document gives about 150,000 tonnes a year. ### Q4. How much does solar panel recycling cost? Recycling costs, excluding dismantling, removal, collection and transport, range from ¥8,000 to ¥12,000/kW, while landfill costs start at about ¥2,000/kW (MOE). ### Q5. Is solar panel recycling mandatory in Japan? Not so far; panels have been handled under the Waste Management Act. The Act on Promoting the Recycling of Solar Cell Waste, passed on 29 May 2026, requires those discarding large amounts of business-use solar cells to take steps toward recycling in line with national criteria. Most of it takes effect within 18 months of promulgation (5 June). ### Q6. What is the decommissioning cost reserve for solar? FIT and FIP-approved solar projects of 10 kW or more set aside decommissioning costs, in principle externally, during the last 10 years of the purchase period. The earliest projects began on 1 July 2022 (Agency for Natural Resources and Energy). ### Q7. How much solar panel waste will the world produce? The 2016 IRENA and IEA-PVPS estimates put global cumulative waste at 1.7-8 million tonnes in 2030 and about 60-78 million tonnes in 2050. For 2050 the largest are China, the United States, Japan, India and Germany (Regular-loss). ### Q8. Where does Saga rank in installed solar capacity? For FIT/FIP facilities, Saga had 775 MW at the end of June 2026, 35th of 47 prefectures (Agency figures sorted by us). Saga has three facilities dedicated to recycling used panels, with 2,112 tonnes a year of capacity (November 2025). ## Source register | Document | Publisher | Date | URL | Accessed | |---|---|---|---|---| | Report on a recycling system for solar power equipment | Joint meeting of the Central Environment Council and the Industrial Structure Council (MOE) | 2025-03 | [https://www.env.go.jp/content/000302385.pdf](https://www.env.go.jp/content/000302385.pdf) | 2026-11-20 | | Reference materials to the report | Same joint meeting (MOE) | 2025-03 | [https://www.env.go.jp/content/000302386.pdf](https://www.env.go.jp/content/000302386.pdf) | 2026-11-20 | | 10th joint meeting, Document 1: solar panel recycling system | Same joint meeting (MOE) | 2026-01-23 | [https://www.env.go.jp/council/content/03recycle03/000371843.pdf](https://www.env.go.jp/council/content/03recycle03/000371843.pdf) | 2026-11-20 | | 11th joint meeting, Document 1 | Same joint meeting (MOE) | 2026-10-06 | [https://www.env.go.jp/council/content/03recycle03/000433712.pdf](https://www.env.go.jp/council/content/03recycle03/000433712.pdf) | 2026-11-20 | | 11th joint meeting, Document 3: basic policy | Same joint meeting (MOE) | 2026-10-06 | [https://www.env.go.jp/council/content/03recycle03/000433714.pdf](https://www.env.go.jp/council/content/03recycle03/000433714.pdf) | 2026-11-20 | | Outline of the Act on Promoting the Recycling of Solar Cell Waste (detailed) | Ministry of the Environment | 2026-06 | [https://www.env.go.jp/content/000404704.pdf](https://www.env.go.jp/content/000404704.pdf) | 2026-11-20 | | Act on Promoting the Recycling of Solar Cell Waste (Act No. 33 of 2026) | e-Gov (Digital Agency) | promulgated 2026-06-05 | [https://laws.e-gov.go.jp/law/508AC0000000033](https://laws.e-gov.go.jp/law/508AC0000000033) | 2026-11-20 | | Solar panel recycling | Ministry of the Environment | updated as needed | [https://www.env.go.jp/recycle/recycling/renewable/page_00345.html](https://www.env.go.jp/recycle/recycling/renewable/page_00345.html) | 2026-11-20 | | Press release on the Cabinet decision on the bill on solar cell waste recycling | Ministry of Economy, Trade and Industry | 2026-04-03 | [https://www.meti.go.jp/press/2026/04/20260403002/20260403002.html](https://www.meti.go.jp/press/2026/04/20260403002/20260403002.html) | 2026-11-20 | | Decommissioning cost reserve for solar power facilities | Agency for Natural Resources and Energy | 2021-09-17 | [https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/dl/fip_2020/fip_document03.pdf](https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/dl/fip_2020/fip_document03.pdf) | 2026-11-20 | | Information disclosure website under the Renewable Energy Act, Table A by prefecture | Agency for Natural Resources and Energy | 2018-03 to 2026-06 | [https://www.fit-portal.go.jp/PublicInfoSummary](https://www.fit-portal.go.jp/PublicInfoSummary) | 2026-11-20 | | End-of-Life Management: Solar Photovoltaic Panels | IRENA and IEA-PVPS | 2016-06 | [https://www.irena.org/-/media/Files/IRENA/Agency/Publication/2016/IRENA_IEAPVPS_End-of-Life_Solar_PV_Panels_2016.pdf](https://www.irena.org/-/media/Files/IRENA/Agency/Publication/2016/IRENA_IEAPVPS_End-of-Life_Solar_PV_Panels_2016.pdf) | 2026-11-20 | | Status of PV Module Recycling in IEA PVPS Task 12 Countries (IEA-PVPS T12-31:2025) | IEA-PVPS | 2025-09 | [https://iea-pvps.org/wp-content/uploads/2025/07/IEA-PVPS-T12-31-2025-REPORT-Status-Module-Recycling.pdf](https://iea-pvps.org/wp-content/uploads/2025/07/IEA-PVPS-T12-31-2025-REPORT-Status-Module-Recycling.pdf) | 2026-11-20 | | Directive 2012/19/EU on waste electrical and electronic equipment (WEEE) | European Parliament and Council (EUR-Lex) | 2012-07-04 | [https://eur-lex.europa.eu/legal-content/EN/TXT/HTML/?uri=CELEX:32012L0019](https://eur-lex.europa.eu/legal-content/EN/TXT/HTML/?uri=CELEX:32012L0019) | 2026-11-20 | ## Notes on reading the figures The outlook for end-of-life panels is the estimate presented to the MOE and METI joint council meeting; annual figures appear only in charts, so this page does not give them. For recycling capacity as of November 2025, p. 6 of Document 1 of the 10th joint meeting and the 11th meeting documents give about 130,000 tonnes a year, while p. 21 of the same 10th meeting document gives about 150,000 tonnes a year; this page uses 130,000 tonnes, which the 11th meeting documents also use. Installed capacity covers only FIT/FIP facilities, not self-consumption and other facilities outside the schemes, so it is not Japan's total solar capacity. Ranks, shares and subtotals are our calculation. Global waste figures are 2016 estimates, rounded in the report. Material shares differ between sources, so each source is shown. We could not find published statistics on the number of projects covered by the decommissioning cost reserve or the total reserved. ## What this page does not cover Local ordinances regulating solar installations and links between solar power and biodiversity are on [renewable energy and biodiversity](https://karatsu-f-f.com/en/ipbes-renewables.html); waste and recycling rates by country on [waste and recycling rates by country](https://karatsu-f-f.com/en/waste-ranking-data.html); circular economy targets on [circular economy in numbers](https://karatsu-f-f.com/en/circular-economy-data.html); and the share of renewables in power on [decarbonisation and CO2 emissions data](https://karatsu-f-f.com/en/carbon-neutral-data.html). This page does not cover solar generation, purchase prices, the performance of individual products, or procedures for disposing of household panels. ## Citing this page and enquiries To cite figures from this page, or to ask about site visits, training or corporate partnerships on small hydropower and wildlife damage control at Yokomakura, please use our [contact page](https://karatsu-f-f.com/en/contact.html) or write to [info@karatsu-f-f.com](mailto:info@karatsu-f-f.com). ## About this page By Hiroaki Kojima (Vice Director, [Karatsu Farm & Food](https://karatsu-f-f.com/en/index.html)) / Contact: [info@karatsu-f-f.com](mailto:info@karatsu-f-f.com) ([contact page](https://karatsu-f-f.com/en/contact.html)) / Published: 20 November 2026 / HTML: https://karatsu-f-f.com/en/solar-panel-waste-data.html This page is made together with AI. See [this data bank and AI](https://karatsu-f-f.com/en/data-bank.html#ai) for how. ## Related links ▶ [Karatsu Data Bank](https://karatsu-f-f.com/en/data-bank.html) ▶ [Green infrastructure in Kyushu (small hydropower at Yokomakura)](https://karatsu-f-f.com/en/green-infrastructure.html) ▶ [Renewable energy and biodiversity](https://karatsu-f-f.com/en/ipbes-renewables.html) ▶ [Circular economy in numbers](https://karatsu-f-f.com/en/circular-economy-data.html) ▶ [Waste and recycling rates by country](https://karatsu-f-f.com/en/waste-ranking-data.html) ▶ [太陽光パネルの廃棄・リサイクル・寿命のデータ2026(日本語)](https://karatsu-f-f.com/solar-panel-waste-data.html)