Japan, under 1,000 kW (June 2026)250 MW250,440.7 kW, 1,023 plants (our tally)
Top prefectureToyama 17,090 kW2nd Gifu, 3rd Nagano
Saga Prefecture30th1,873.6 kW, 12 plants; Karatsu largest
World small hydro (up to 10 MW)About 79.0 GW64% untapped; Japan 4th (UNIDO)

How much small hydropower does Japan have? (2026)

At the end of June 2026, hydropower plants under 1,000 kW whose electricity is bought under Japan's feed-in tariff (FIT/FIP) numbered 1,023 with 250,440.7 kW, or about 250 MW (our tally of Agency for Natural Resources and Energy, installed capacity by prefecture, June 2026). Toyama Prefecture has the most with 17,090 kW, followed by Gifu and Nagano. Saga Prefecture ranks 30th with 1,873.6 kW from 12 plants.

This page is part of the Karatsu Data Bank by Karatsu Farm & Food, a nonprofit in Karatsu, Saga Prefecture. It sets out small hydropower figures from the world (installed capacity by country) to Japan (the national target and prefectural ranking), Saga Prefecture (by municipality) and our own work in Karatsu, as published by the issuing bodies, without conclusions or evaluative wording. The size limit for "small" hydropower differs between sources: the UNIDO report counts plants up to 10 MW (10,000 kW), and the FIT data of Japan's Agency for Natural Resources and Energy (ANRE) group "small and medium hydropower" as four size bands under 30,000 kW. The prefectural ranking on this page adds the two bands "under 200 kW" and "200 kW to under 1,000 kW"; this is our own tally.

QuestionFigureAs ofSource
Installed in Japan, under 1,000 kW (new and transferred certifications)250,440.7 kW, 1,023 plantsJune 2026ANRE (our tally)
Top prefectureToyama 17,090 kW, 54 plantsJune 2026ANRE (our tally)
Saga Prefecture30th, 1,873.6 kW, 12 plantsJune 2026ANRE (our tally)
National target, small and medium hydro10.4 GW (FY2030)June 2025 documentANRE
World small hydropower installed (up to 10 MW)About 79.0 GW, 64% untappedWSHPDR 2022UNIDO and ICSHP
Japan, up to 10 MW3,577 MW, 4th in the worldWSHPDR 2022UNIDO and ICSHP
"Installed" in the FIT data means purchase of electricity under the scheme has started (ANRE). 1 GW = 1,000 MW = 1,000,000 kW.

Small hydropower ranking by country (up to 10 MW, WSHPDR 2022)

RankCountryInstalled (MW)Potential (MW)Share developed
1China41,985.063,500.066.1%
2USA3,681.010,583.034.8%
3Italy3,648.47,073.051.6%
4Japan3,577.010,330.034.6%
5Norway2,924.07,162.040.8%
6France2,200.02,615.084.1%
7Spain2,145.02,158.099.4%
8Germany1,674.01,830.091.5%
9Turkey1,662.24,891.534.0%
10Brazil1,608.23,737.843.0%
Top 10 countries by installed small hydropower capacity up to 10 MW. Potential is the known potential including developed capacity. Share developed is installed divided by potential (our calculation). Countries without data for the 10 MW definition, such as India, are not included. Source: UNIDO and ICSHP, World Small Hydropower Development Report 2022, Executive Summary attachments (pp. 17 to 19)
China41,985.0 MW
USA3,681.0 MW
Italy3,648.4 MW
Japan3,577.0 MW
Norway2,924.0 MW
France2,200.0 MW
Spain2,145.0 MW
Germany1,674.0 MW
Turkey1,662.2 MW
Brazil1,608.2 MW
Installed small hydropower up to 10 MW. Bars are drawn on a scale of 0 to 44,000 MW. Same values as the table above.

According to UNIDO and the International Center on Small Hydro Power (ICSHP), installed small hydropower capacity up to 10 MW is about 79.0 GW worldwide, against a known potential of 221.7 GW including developed capacity, so 64% remains untapped. China accounts for 53% of installed capacity, followed by the United States, Italy, Japan and Norway; together these five countries hold almost 71% (UNIDO and ICSHP, pp. 5 and 8). Japan's 3,577 MW up to 10 MW is about 34.6% of its potential of 10,330 MW (our calculation).

Japan's target for small and medium hydropower (10.4 GW in FY2030)

ItemFigureAs of
Small and medium hydro installed (including 9.6 GW from before the FIT)10.0 GWDecember 2024 (preliminary)
FY2030 target in the energy mix10.4 GWFY2030
Additional capacity needed to reach the targetAbout 0.4 GWOver about six years
Added in the most recent four years or so0.2 GWTo December 2024
Certified under FIT/FIP but not yet operating0.3 GWDecember 2024
Hydropower share of electricity (FY2040 outlook)About 8 to 10%7.6% in FY2023 (preliminary)
Source: ANRE, Future renewable energy policy (Material 1, 74th meeting of the subcommittee on large-scale renewable energy introduction and next-generation networks, 3 June 2025), pp. 4 and 31. The FY2040 outlook is from the materials of the Seventh Strategic Energy Plan (February 2025).

ANRE notes that the remaining sites for small and medium hydropower lie further into the mountains and take longer to develop, and that about 0.4 GW must be added over about six years to reach the FY2030 target (ANRE, p. 31). In the FIT data for June 2026, installed small and medium hydropower (under 30,000 kW) was 1.879 GW from 1,048 plants under new certification and 0.242 GW from 262 plants transferred from earlier schemes (ANRE FIT portal). The 250,440.7 kW under 1,000 kW consists of 179,031.1 kW under new certification and 71,409.6 kW transferred (our tally).

Small hydropower ranking by prefecture (under 1,000 kW, June 2026)

RankPrefectureInstalled (kW)PlantsOf which under 200 kW (kW)
1Toyama17,090.0542,634.9
2Gifu15,680.5663,452.7
3Nagano15,494.2826,404.7
4Hokkaido14,532.5341,066.5
5Kagoshima14,103.5401,617.0
6Shizuoka12,416.0472,092.2
7Yamanashi10,579.6391,732.6
8Fukui10,269.0362,538.5
9Yamagata9,564.9362,606.5
10Fukushima8,838.9251,110.9
11Gunma8,820.4372,157.4
12Shimane8,396.9292,751.9
13Hiroshima7,943.4333,703.4
14Okayama7,521.331991.3
15Niigata6,888.4191,131.4
30Saga1,873.612874.6
Top 15 and Saga. New and transferred certifications added together and ranked by installed capacity (our calculation). Ranked 16th to 20th are Tottori 6,743.1 kW, Oita 6,003.4 kW, Kumamoto 5,696.5 kW, Miyazaki 5,553.0 kW and Akita 4,979.5 kW. Source: ANRE, Table A: certified and installed capacity by prefecture (June 2026), Tables A1 and A2
Toyama17,090.0 kW
Gifu15,680.5 kW
Nagano15,494.2 kW
Hokkaido14,532.5 kW
Kagoshima14,103.5 kW
Shizuoka12,416.0 kW
Yamanashi10,579.6 kW
Fukui10,269.0 kW
Yamagata9,564.9 kW
Fukushima8,838.9 kW
Saga1,873.6 kW
Installed capacity under 1,000 kW (top 10 and Saga). Bars are drawn on a scale of 0 to 18,000 kW. Same values as the table above.

The seven prefectures of Kyushu rank as follows: Kagoshima 5th (14,103.5 kW), Oita 17th (6,003.4 kW), Kumamoto 18th (5,696.5 kW), Miyazaki 19th (5,553.0 kW), Fukuoka 21st (4,851.3 kW), Saga 30th (1,873.6 kW), Nagasaki 44th (708.9 kW) (our calculation). The top five prefectures together hold 76,900.7 kW, about 30.7% of the national 250,440.7 kW (our calculation).

Trend in small hydropower capacity (Japan and Saga, 2018 to 2026)

As ofJapan (kW)Japan (plants)Saga (kW)Saga (plants)
Mar 2018101,280.3458417.75
Mar 2019118,083.8536626.08
Mar 2020130,231.06111,624.79
Mar 2021161,006.87121,654.710
Mar 2022186,100.18111,654.710
Mar 2023202,628.88631,674.611
Mar 2024219,721.29191,873.612
Mar 2025235,844.89791,873.612
Mar 2026246,907.21,0161,873.612
Jun 2026250,440.71,0231,873.612
Installed capacity under 1,000 kW, new and transferred certifications combined (our tally), at the end of March each year and June 2026. Source: ANRE Table A for each date (March 2018, March 2022, March 2026, June 2026 and others; all editions on the FIT portal)
Mar 2018101,280.3 kW
Mar 2019118,083.8 kW
Mar 2020130,231.0 kW
Mar 2021161,006.8 kW
Mar 2022186,100.1 kW
Mar 2023202,628.8 kW
Mar 2024219,721.2 kW
Mar 2025235,844.8 kW
Mar 2026246,907.2 kW
Jun 2026250,440.7 kW
Installed capacity under 1,000 kW in Japan. Bars are drawn on a scale of 0 to 260,000 kW. Same values as the table above.

Installed capacity under 1,000 kW in Japan rose from 101,280.3 kW in March 2018 to 250,440.7 kW in June 2026, about 2.47 times (our calculation). Saga Prefecture went from 417.7 kW (5 plants) in March 2018 to 1,873.6 kW (12 plants) in March 2024 and has been unchanged since.

Small hydropower in Saga Prefecture and Karatsu City (by municipality, June 2026)

MunicipalityInstalled (kW)Plants
Karatsu City999.01
Tara Town248.02
Kanzaki City199.01
Kashima City196.01
Saga City132.74
Genkai Town49.01
Yoshinogari Town30.01
Ogi City19.91
Total1,873.612
Installed capacity under 1,000 kW, new and transferred certifications combined (our tally). Only the eight municipalities with installations. Source: ANRE, Table B: certified and installed capacity by municipality (June 2026), Tables B1 and B2

Within Saga Prefecture, plants under 1,000 kW are found in eight municipalities. Karatsu City's 999 kW (one plant in the 200 kW to under 1,000 kW band) is the largest, about 53.3% of the prefectural total (our calculation). Karatsu City also has one plant of 2,100 kW in the 1,000 kW to under 5,000 kW band (specified hydropower) (ANRE Table B).

An example from Karatsu (our work)

ItemValueAs of
Small hydro generator in the Yokomakura irrigation channel1 unitInstalled 7 October 2026
Output and operationbeing recorded; to be published once compiled
Our generator charges a battery that powers electric fences, and is recorded separately from the FIT figures above, which cover plants selling electricity under the scheme. Source: our records

At Yokomakura, a nature symbiosis site in Ochi, Karatsu City, we installed a small hydro generator (Pikopika 10) in the irrigation channel that waters the rice fields on 7 October 2026. Its electricity powers electric fences against wildlife damage. The work is supported by the Japan Fund for Global Environment of the Environmental Restoration and Conservation Agency (ERCA), and we are now recording output and operation. The project is described on Green Infrastructure (small hydropower, wildlife-damage control and biodiversity at Yokomakura), and the site itself on Nature Positive and our OECM site.

For visits to the small hydro generator and electric fences at Yokomakura, training or partnerships with companies, see Citing this page and enquiries below.

Frequently asked questions

Q1. How much small hydropower does Japan have?

Hydropower plants under 1,000 kW selling electricity under FIT/FIP numbered 1,023 with 250,440.7 kW at the end of June 2026 (our tally of ANRE data). Small and medium hydropower, for which the government sets a target, stood at 10.0 GW in December 2024 including plants from before the FIT, against a FY2030 target of 10.4 GW.

Q2. Which prefectures have the most small hydropower?

By installed capacity under 1,000 kW (June 2026): 1 Toyama 17,090 kW, 2 Gifu 15,680.5 kW, 3 Nagano 15,494.2 kW, 4 Hokkaido 14,532.5 kW, 5 Kagoshima 14,103.5 kW (our tally).

Q3. Which countries have the most small hydropower?

For plants up to 10 MW, China has the most with 41,985 MW (53% of the world), followed by the United States, Italy, Japan and Norway. The world total is about 79.0 GW (UNIDO and ICSHP, WSHPDR 2022).

Q4. How much small hydropower is there in Saga Prefecture?

Installed capacity under 1,000 kW was 1,873.6 kW from 12 plants in June 2026, 30th among prefectures. Karatsu City's 999 kW is the largest in the prefecture, about 53.3% of the total (our calculation).

Q5. What size counts as small hydropower?

It depends on the source. The UNIDO report counts plants up to 10 MW (10,000 kW); ANRE's FIT data treat "small and medium hydropower" as under 30,000 kW. The prefectural ranking on this page adds the two FIT bands under 1,000 kW.

Q6. Is small hydropower increasing in Japan?

Installed capacity under 1,000 kW grew from 101,280.3 kW in March 2018 to 250,440.7 kW in June 2026, about 2.47 times (our calculation). ANRE notes that remaining sites lie further into the mountains and take longer to develop.

Q7. Can I see small hydropower in Karatsu?

We installed a small hydro generator in the irrigation channel at Yokomakura in Ochi, Karatsu City, to power electric fences against wildlife damage (7 October 2026). Please use our contact page to ask about visits or training.

Source register

DocumentPublisherDateURLAccessed
Certified and installed capacity by prefecture, end of June 2026 (Table A)Agency for Natural Resources and Energy2026-11-19 (published)https://www.fit-portal.go.jp/servlet/servlet.FileDownload?file=015hA000001K8FN2026-11-19
Certified and installed capacity by municipality, end of June 2026 (Table B)Agency for Natural Resources and Energy2026-11-19 (published)https://www.fit-portal.go.jp/servlet/servlet.FileDownload?file=015hA000001K8Ib2026-11-19
Certified and installed capacity by prefecture, end of March 2018 to 2026 (Table A)Agency for Natural Resources and Energyeach datehttps://www.fit-portal.go.jp/PublicInfoSummary2026-11-19
FIT/FIP information disclosure websiteAgency for Natural Resources and Energy2026-11-19 (updated)https://www.fit-portal.go.jp/PublicInfoSummary2026-11-19
Future renewable energy policy (Material 1, 74th meeting of the subcommittee on large-scale renewable energy introduction and next-generation networks)Agency for Natural Resources and Energy2025-06-03https://www.meti.go.jp/shingikai/enecho/denryoku_gas/saisei_kano/pdf/074_01_00.pdf2026-11-19
World Small Hydropower Development Report 2022, Executive SummaryUNIDO and ICSHP2023-05 (posted)https://www.unido.org/sites/default/files/files/2023-05/ENGLISH%20SUMMARY-2022.pdf2026-11-19
World Small Hydropower Development Report 2022 (web page)UNIDOweb pagehttps://www.unido.org/WSHPDR20222026-11-19

Notes on reading the figures

"Installed" in the FIT data means that purchase of electricity under the Renewable Energy Act has started; it excludes plants for own use outside the scheme and plants that ran before the scheme and did not transfer. New certifications are plants certified after the scheme began; transferred certifications are plants already generating when it began that moved into it. The prefectural and municipal values add ANRE's "under 200 kW" and "200 kW to under 1,000 kW" capacities in Tables A and B; this is our own tally, not a figure ANRE publishes as "small hydropower". ANRE notes that some data are still being checked and contain small errors. UNIDO's figures are estimates from national sources, exclude countries without data for the 10 MW definition (such as India) and refer to different years by country. The national 10.4 GW target is ANRE's figure for "small and medium hydropower", not for plants under 1,000 kW alone. The ANRE document does not state a size limit for this category, and its 10.0 GW installed figure includes 9.6 GW from before the FIT, so it is counted differently from the FIT data tallies.

What this page does not cover

For renewable energy and biodiversity, including dam operation, see Renewable energy and biodiversity; for national green infrastructure figures, Green infrastructure data; and for CO2 emissions and the share of renewables, CO2 emissions and decarbonisation data. This page does not cover lists of hydropower plants of 1,000 kW or more, pumped storage, electricity generated (kWh) by prefecture, purchase prices or the operators of individual plants.

Citing this page and enquiries

To cite figures from this page, or to ask about visits and training at the Yokomakura small hydro generator and electric fences or partnerships with companies, please use our contact page or write to info@karatsu-f-f.com.

About this page

By Hiroaki Kojima (Vice Director, Karatsu Farm & Food) / Contact: info@karatsu-f-f.com (contact page) / Published: 20 November 2026 / Markdown: small-hydro-data.md

This page is made together with AI. See this data bank and AI for how.

Related links

▶ Karatsu Data Bank
▶ Green Infrastructure at Yokomakura
▶ Nature Positive and our OECM site
▶ Green infrastructure data
▶ Renewable energy and biodiversity
▶ CO2 emissions and decarbonisation data
▶ 小水力発電の都道府県ランキング2026(日本語)

  • Address
  • 847-0017
  • 3-7-22 Higashi-Karatsu, Karatsu City, Saga, Japan